[edit] Introduction
Following extensive industry consultation, ICE’s NEC division launched the NEC4 Alliance Contract (ALC) at the NEC Users’ Group annual seminar in London earlier this year.
The contract marks the next stage in NEC’s 25-year history of collaborative construction procurement and creates a ‘true’ alliance arrangement, where the client and all key members of the supply chain are engaged under a single set of conditions of contract.
All members of an ALC alliance have an equal voice and share in the performance of the alliance as a whole, as opposed to their own individual performance.
The contract is designed for use on major projects or programmes of work, where longer-term collaborative ways of working are to be created.
It can also be used to deliver a programme where a number of lower-value projects can be combined to create a major programme of work.
[edit] NEC approach to alliancing
All contracts in the NEC4 contract suite, which was launched in 2017, and their predecessors are collaborative in nature. They allow all key members of the supply chain to be engaged under contracts that contain the requirement at clause 10.2 for the parties to, "act in a spirit of mutual trust and co-operation".
Further collaboration can be achieved using secondary option X12 multi-party collaboration, which incentivises multiple suppliers to collaborate to achieve a common set of objectives set by the promotor (commonly the client).
ALC takes this further, building option X12 into the core of the contract.
Members of the alliance are thus required to collaborate with each other to achieve alliance objectives and individual member objectives. They work collectively to support delivery of the contract and establish an integrated alliance delivery team on a best-for-project basis.
[edit] Structure of the alliance
The client has a dual role in the ALC in that it has certain retained powers and functions that it performs outside of the alliance, as well as the power and functions of an alliance member.
An alliance board has overall responsibility for the alliance and sets strategy, appoints an alliance manager, makes decisions and resolves disputes.
Each alliance member has an alliance board representative, including the client.
The alliance manager manages the contract on behalf of the alliance and undertakes many of the functions exercised by the project manager or service manager under other NEC contracts, as well as some aspects of the contractor’s role.
Reflecting the collaborative nature of the contract, the majority of decisions of the alliance have to be made unanimously by the alliance board.
Alliance members share the majority of risk under the contract and agree that there can be no claims made against other members of the alliance except for very limited exceptions, principally due to a deliberate breach of contact.
[edit] Performance table
Payment by the client to other alliance members, which are referred to as partners, is on the basis of defined cost.
All partners are incentivised to achieve alliance objectives through a performance table, which sets out what performance is required and the reward or deduction regimes that apply if the performance targets are over- or under-achieved.
There’s already been considerable interest in the ALC from NEC users. The new contract also supports ICE’s Project 13 initiative to shift infrastructure procurement from transactions to enterprises.
This article is based on the author’s briefing article in the latest issue of the ICE Civil Engineering journal and originally appeared at: https://www.ice.org.uk/news-and-insight/the-civil-engineer/november-2018/new-nec4-contract-creates-true-alliance
--The Institution of Civil Engineers
[edit] Related articles on Designing Buildings Wiki
- ICE articles on Designing Buildings Wiki.
- ICE Conditions of Contract.
- NEC contract change management systems.
- NEC contracts and collaborative working.
- NEC4 - legal and insurance aspects.
- NEC4 Alliance contract.
- NEC4 Design, Build and Operate Contract.
- NEC4.
- Partnering.
- Procurement route.
- Project 13.
- The Institution of Civil Engineers.
Featured articles and news
Combating burnout.
The 5 elements of seiri, seiton, seiso, seiketsu and shitsuke.
Shading for housing, a design guide
A look back at embedding a new culture of shading.
The Architectural Technology Awards
The AT Awards 2025 are open for entries!
ECA Blueprint for Electrification
The 'mosaic of interconnected challenges' and how to deliver the UK’s Transition to Clean Power.
Grenfell Tower Principal Contractor Award notice
Tower repair and maintenance contractor announced as demolition contractor.
Passivhaus social homes benefit from heat pump service
Sixteen new homes designed and built to achieve Passivhaus constructed in Dumfries & Galloway.
CABE Publishes Results of 2025 Building Control Survey
Concern over lack of understanding of how roles have changed since the introduction of the BSA 2022.
British Architectural Sculpture 1851-1951
A rich heritage of decorative and figurative sculpture. Book review.
A programme to tackle the lack of diversity.
Independent Building Control review panel
Five members of the newly established, Grenfell Tower Inquiry recommended, panel appointed.
Welsh Recharging Electrical Skills Charter progresses
ECA progressing on the ‘asks’ of the Recharging Electrical Skills Charter at the Senedd in Wales.
A brief history from 1890s to 2020s.
CIOB and CORBON combine forces
To elevate professional standards in Nigeria’s construction industry.
Amendment to the GB Energy Bill welcomed by ECA
Move prevents nationally-owned energy company from investing in solar panels produced by modern slavery.
Gregor Harvie argues that AI is state-sanctioned theft of IP.
Experimental AI housing target help for councils
Experimental AI could help councils meet housing targets by digitising records.